Retrofits always have their unique challenges and Canadian systems integrator Graytek was faced with a highly unusual challenge when designing this basement theater. The room had three tree trunk posts, which were part of the structural integrity of the home so they had to stay intact. Since they were in the middle of the room, it was necessary to work around them while still maximizing the screen size and seating area.
No comments:
Post a Comment